Merck Sharp and Dohme weather protection
DIALOG Fitzroy were contracted to provide full access and weather protection for an industrial building located in Continue reading
DIALOG Fitzroy were contracted to provide full access and weather protection for an industrial building located in Continue reading
TPL Access were contracted by Freyssinet NZ to provide safe access to 33m tall cement silos. Silo’s 3 – 6, located at the Golden Bay Cement plant in Continue reading
Parfitt Construction contacted Layher’s engineering team to design a scaffold for the Tekapo Intake Gate project. This complex and time critical shutdown project was located at Genesis Energy’s Tekapo A Hydro Power Station intake in Tekapo, Canterbury. Continue reading
At the top of the South Island, Upright Scaffolding were contracted to provide access to all areas to a bulk fuel storage tank. Continue reading
Brazier Scaffolding was asked to supply this temporary pedestrian bridge which enabled access over a washed-out culvert near Doubtful Sound in the South Island. Continue reading
The helideck onboard the vessel Raroa required maintenance work in the form of blasting and painting. Mark Dunn of DIALOG Fitzroy Continue reading
Remarkable efficiency was achieved by Ausscaff with their provision of access for shutdown remediation works on this project. Using laser Continue reading
DIALOG Fitzroy were contracted to build a large scale façade scaffold to refurbish external walls and a large window for Continue reading
Rocket Scaffolding constructed several scaffolds for Villa Maria Winery in Hawkes Bay. Lasting more than 6 months Continue reading