Fonterra Waitoa Scaffold
DIALOG Fitzroy were contracted to build a large scale façade scaffold to refurbish external walls and a large window for one of Fonterra’s milk powder facilities. The façade scaffolding was constructed using Layher’s Allround modular scaffolding system, as well as two GEDA 500 ZZP hoists for transporting gear up and down the scaffold.

Efficient scaffold design
Mark Dunn of DIALOG Fitzroy explains, “the client presented a very tight deadline of three months for this job, so an efficient design was key to delivering the build on time. The Layher engineering team provided extensive support which assisted in this complicated build. The client was very happy with the time frame and safe manner the scaffold was constructed in.”
Thanks to DIALOG Fitzroy for the use of these photos.

-
Contact
Mark Dunn
Company
Location
Website
-
Components
Layher Allround Scaffolding
GEDA 500 ZZP hoistComments
The client was very happy with the time frame and safe manner the scaffold was constructed in
Mark Dunn, DIALOG Fitzroy
MORE SCAFFOLDING PROJECTS

Allround Scaffolding Pedestrian Bridge
Brazier Scaffolding was asked to supply this temporary pedestrian bridge which enabled access over a washed-out culvert near Doubtful Sound in the South Island. Continue reading

Raroa Helideck Access
The helideck onboard the vessel Raroa required maintenance work in the form of blasting and painting. Mark Dunn of DIALOG Fitzroy Continue reading