St. Patricks Church re-strengthening
St. Patricks Church in Macandrew Road, Dunedin is undergoing a complete re-strengthening and internal fit-out. Bramwell Scaffolding were given the task to protect the building from the elements in order for the project to run smoothly. With the assistance of Layher’s engineering team a Keder Roof spanning 17 metres was designed to sit on top of a 12 metre high Layher Allround Scaffolding System.
Prevent uplift
“We needed extra components for the build and Layher were able to provide these to meet our deadline” says Bramwell Scaffolding Manager, Graeme Evans. “The roof needed to be secured down to prevent uplift at each truss. This was achieved by using 2.5 tonne tie downs fixed into the foundation of the building.”
Thanks Graeme Evans of Bramwell Scaffolding for the use of this photo.
-
Contact
Graeme Evans
Company
Location
Website
-
Components
Details
Keder Roof spanning 17 metres was designed to sit on top of a 12 metre high Layher Allround Scaffolding System
Comments
Layher provided extra components to help meet our deadline!
Graeme Evans
MORE SCAFFOLDING PROJECTS
Roof Goes XL
Civil Works Scaffolding were asked to provide a weather protection solution for a fast-food restaurant on the Kapiti Coast. Continue reading
Merck Sharp and Dohme weather protection
DIALOG Fitzroy were contracted to provide full access and weather protection for an industrial building located in Continue reading