National War Memorial Underpass

National War Memorial Park Underpass by Wellington Scaffolding
National War Memorial Park Underpass by Wellington Scaffolding

National War Memorial Park Underpass

The National War Memorial Park Underpass, the Arras Tunnel, involved the in situ pouring of a concrete roof spanning 14.5m. The benefit of pouring the roof slab, rather than using pre-formed slabs, is that the strength of the underpass tunnel was increased to withstand a high magnitude, 1-in-2500 year earthquake.

130m long tunnel

“At the completion of the tunnel roof pour, each 40 metre section weighed approximately 1,200 tonne and was propped using the Layher Allround System. The entire job required over 10,000 cubic metres of falsework and the 130m long tunnel was completed in eight weeks” said Wellington Scaffolding Services Director, Chris Warren.

Excellent feedback

An uncompromising attitude toward safety and excellence was essential given that, at the peak of construction, up to 220 people were working above and below the surface of a site that was only the size of three rugby fields. “There was some excellent feedback from the Memorial Park Alliance staff and contractors alike” Chris said.

Thanks to Wellington Scaffolding Services for the use of these photos.


Propped using the Layher Allround System
Each 40 metre section of the tunnel weighed approximately 1,200 tonne and was propped using the Layher Allround System
national-war-memorial-underpass_2
An uncompromising attitude toward safety and excellence was essential given that up to 220 people were working above and below the surface
national-war-memorial-underpass_3
Layher Allround Scaffolding provided essential support for the 10,000 cubic metres of falsework

MORE SCAFFOLDING PROJECTS


 Pipe Bridge Refurbishment

Keeping Dairy Moving Acomplex three-year refurbishment was undertaken to upgrade this 360-metre long pipe bridge in the North Island. With the plant processing up to 14 million litres of milk a day, it was critical that work progressed without interrupting daily operations. Precision Scaffolding for an Operational Industrial Environment DIALOG Fitzroy was engaged to deliver the […] Continue reading