Xavier College Theatre
Scaffolding the new 450 seat theatre at this Melbourne college required a 350m² suspended mat scaffold that appears to float above the auditorium. Supported only at each end it spans over 18m from front to back, and from side to side it spans up to 20m without additional support.
Month ahead of schedule
Walton Construction’s Site Manager Neil Timms said, “Not only did the fast installation of Layher Allround enable us to start the project one month ahead of schedule, it also gave us the ability to overlap trades on site to save time; something that could not be achieved using other systems.” Neil also mentioned that “by doing away with the need for a bird cage, construction of the tiered seating began more than 3 weeks earlier than expected.”
The AutoCAD drawings were prepared by Laura Barnett from the Layher Design Team.
Thanks to Walton Construction and Paul Houghton of SwiftScaff for the use of this photo.
-
Contact
Paul Houghton
Company
SwiftScaf
Location
-
Components
Details
Scaffolding the new 450 seat theatre at this Melbourne college required a 350m² suspended mat scaffold.
Comments
Not only did the fast installation of Layher Allround enable us to start the project one month ahead of schedule, it also gave us the ability to overlap trades on site to save time
Neil Timms, Walton Construction
MORE SCAFFOLDING PROJECTS
Innovative Birdcage Solution for Naenae Pools Redevelopment
Innovative Birdcage Scaffolding for Naenae Pools Redevelopment When WorkZone Scaffolds was engaged to provide scaffolding for the Naenae Pools redevelopment in Lower Hutt, the team faced a significant access challenge. The major community project required extensive external scaffolding and multiple large-scale birdcage structures to support construction of the new aquatic facilities. With numerous trades working […] Continue reading
Layher FlexDeck Takes Scaffolding to New Heights at Skyline Queenstown
Innovative Cantilever Scaffold Solution Above a Live Luge Track When Brazier Scaffolding was engaged to provide scaffolding for the major Skyline Queenstown redevelopment, the team faced a unique combination of engineering, logistical and operational challenges. Situated high above Queenstown on Bob’s Peak, the iconic tourism destination required a highly specialised access solution capable of supporting […] Continue reading