Overhead Site Office
Arrow International asked Scafit to design a gantry to provide both public protection and a platform for their site sheds during the construction of the Te Aro Towers apartment complex in Taranaki Street, Wellington. The gantry solution also included a loading bay and site boundary.
Safety and loading
There were significant challenges with wind loadings as the gantry needed to be self supporting and could not be tied to the building structure until piling was complete. Andy Rich commented “the Scafit team delivered and Arrow International was impressed by the versatility, safety and loading capabilities of the Layher Allround system”.
-
Contact
Andy Rich
Company
Location
Website
-
Components
Layher Allround Scaffolding, Layher SpeedyScaf Scaffolding
Details
a gantry to provide both public protection and a platform for their site sheds during the construction
Comments
Arrow International was impressed by the versatility, safety and loading capabilities of the Layher Allround system
Andy Rich




MORE SCAFFOLDING PROJECTS
Rocket Reclad
Efficient scaffold design for central city reclad Rocket Scaffolding were engaged to support a recladding project on a multi-storey commercial building in central Auckland. With public access beneath and retail operations ongoing, the scaffold design needed to enable safe, uninterrupted access while ensuring the structure could be assembled and dismantled efficiently. Smart solutions for footpath […] Continue reading
George Begg Festival Billboard by Brazier Scaffolding
Showcasing Southland’s motorsport history with a bold welcome Invercargill’s George Begg Festival brings historic racing to life. With vintage car displays, competitive track action, and family-friendly entertainment, the event draws thousands of motorsport fans each year. To make sure the festival started with impact, Brazier Scaffolding were called in to build a towering 12-metre-high scaffold […] Continue reading