Overhead Site Office
Arrow International asked Scafit to design a gantry to provide both public protection and a platform for their site sheds during the construction of the Te Aro Towers apartment complex in Taranaki Street, Wellington. The gantry solution also included a loading bay and site boundary.
Safety and loading
There were significant challenges with wind loadings as the gantry needed to be self supporting and could not be tied to the building structure until piling was complete. Andy Rich commented “the Scafit team delivered and Arrow International was impressed by the versatility, safety and loading capabilities of the Layher Allround system”.
-
Contact
Andy Rich
Company
Location
Website
-
Components
Layher Allround Scaffolding, Layher SpeedyScaf Scaffolding
Details
a gantry to provide both public protection and a platform for their site sheds during the construction
Comments
Arrow International was impressed by the versatility, safety and loading capabilities of the Layher Allround system
Andy Rich
MORE SCAFFOLDING PROJECTS
Roof Goes XL
Civil Works Scaffolding were asked to provide a weather protection solution for a fast-food restaurant on the Kapiti Coast. Continue reading
1 Queen Street
Geeves Auckland delivered a craned scaffold solution for 1 Queen Street Auckland. Mike Wild of Geeves Auckland explains “with the Layher components we Continue reading