Overhead Site Office
Arrow International asked Scafit to design a gantry to provide both public protection and a platform for their site sheds during the construction of the Te Aro Towers apartment complex in Taranaki Street, Wellington. The gantry solution also included a loading bay and site boundary.
Safety and loading
There were significant challenges with wind loadings as the gantry needed to be self supporting and could not be tied to the building structure until piling was complete. Andy Rich commented “the Scafit team delivered and Arrow International was impressed by the versatility, safety and loading capabilities of the Layher Allround system”.
-
Contact
Andy Rich
Company
Location
Website
-
Components
Layher Allround Scaffolding, Layher SpeedyScaf Scaffolding
Details
a gantry to provide both public protection and a platform for their site sheds during the construction
Comments
Arrow International was impressed by the versatility, safety and loading capabilities of the Layher Allround system
Andy Rich
MORE SCAFFOLDING PROJECTS
Cancer Care Construction Canterbury
Canterbury Scaffolding were asked to provide a scaffold for the construction of a Cancer Society Care Unit in Papanui. Canterbury Scaffolding’s Continue reading
Amazing Race Camera Tower
MAC Services were asked to build a camera tower for the Amazing Race reality television show! Director of Operations at MAC Services, Continue reading