Westpac Stadium Tattoo

Westpac Stadium Tattoo by Geeves Scaffolding
Westpac Stadium Tattoo by Geeves Scaffolding

Westpac Stadium Tattoo

Wellington hosted the Royal Edinburgh Military Tattoo at the Westpac Stadium. The contractor, NZ Festival, engaged Geeves Scaffolding to build the scaffold in order to allow other trades to complete the framework and castle cladding.

Went as planned

“Speed of construction was very important, the erection of the Layher Allround modular system went as planned and was erected as per the designs drawn up by Alex Ignjatovic of Layher” said Tim Geeves of Geeves Scaffolding.

Layher design team

60 tonne of the Layher Allround System was erected in four days using 900 man hours to complete the work. “We found Layher’s design team second to none. They worked closely with us to ensure the build was as fast and as efficient as possible. Thank you to Scott, Alex and the team for their outstanding support on this project” said Tim.

Thanks to Geeves Scaffolding for the use of these photos.


Edinburgh Castle built in Westpac Stadium using Layher Scaffolding
Edinburgh Castle built by Geeves Scaffolding in Westpac Stadium using Layher Scaffolding
Behind the castle cladding a safe stronghold constructed of Layher scaffolding