Scaffolding with More Possibilities. Lighter. Faster. Stronger. Layher.

 Pipe Bridge Refurbishment

Pipe-Bridge-Refurbishment
Pipe Bridge Refurbishment, by DIALOG Fitzroy

Keeping Dairy Moving

Acomplex three-year refurbishment was undertaken to upgrade this 360-metre long pipe bridge in the North Island. With the plant processing up to 14 million litres of milk a day, it was critical that work progressed without interrupting daily operations.

Precision Scaffolding for an Operational Industrial Environment

DIALOG Fitzroy was engaged to deliver the scaffolding solution, and their team rose to the challenge with precision and professionalism. The first stage focused on an 88-metre section of the bridge, requiring access structures 18 metres high and 9 metres wide, including a 9-metre scaffold bridge spanning an internal roadway, which allowed traffic to continue moving safely underneath.

To meet the technical demands of the site, the team selected Layher Allround Lightweight (LW) Scaffolding, using it to build a four-level scaffold with a total deck area of 3,200m². The modular design of the system enabled fast, adaptable assembly despite poor weather conditions and the logistical constraints of a busy industrial environment. Layher’s Allround LW Scaffolding diagonal braces enabled bridging over structures and driveways without needing special beams and time-consuming tube and couplers.

During the planning phase, the team worked closely with Layher’s engineering team, using detailed scaffold drawings and 3D modelling to refine the design and streamline the build. The site foreman later noted that the clarity of the drawings played a key role in keeping the team safe, efficient, and on schedule.

Layher is proud to have supported DIALOG Fitzroy on this significant industrial project. Special thanks to Dale Mutton and the team for their outstanding work and for sharing these images.

Allround Scaffolding LW (Lightweight) – The Benefits for You

  • ◣ Low weight of the individual parts thanks to special high-tensile steel (World first!)
  • ◣ Higher load bearing capacity and innovative design reduces parts and weight of overall solution
  • ◣ Time-saving assembly and disassembly thanks to reduced weight and parts
  • ◣ Transport and storage saving thanks to reduced weight and volume
  • ◣ Impressive cost-effectiveness and flexibility
  • ◣ Maintenance-free, always ready for use and durable hot-dip galvanised components
  • ◣ Backed by dependable local stockholding and expert support


MORE SCAFFOLDING PROJECTS