HomeScaffold Projects Westport Cement Plant
Westport Cement Plant
Nayland scaffold were asked to supply a solution for weather tightness and containment so a section of Kiln 2 at Holcim’s Westport cement plant could be blasted and painted in a Kiln shut down with an 11 day maximum total time frame.

With the Keder Roof System we were able to pre erect the Allround side scaffold structures and wrap them, and have the roof sections pre assembled on the ground at the same time. So once the Kiln stopped rotating the roof sections were lifted into place and the last of the roof sheeting was installed. Within 10 hours of the Kiln switched off the maintenance crew were able to start blasting!

Thank you to Jonny Benbow from Nayland Scaffold for the use of these photos.

Nayland Scaffold and Crane website: www.naylandscaffold.co.nz

Bookmark and Share

Download PDF


pdficon Westport Cement Plant (1.7 MB)


Links to Layher products


Keder Roofing System from Layher Scaffolding

Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative









 
RSS feed - Layher ScaffoldingYouTube - Layher ScaffoldingTwitter - Layher ScaffoldingFacebook - Layher ScaffoldingLayher Scaffolding