HomeScaffold Projects Network Rail Pedestrian Bridge
Network Rail Pedestrian Bridge
Layher Scaffolding were called upon to provide temporary access for passengers using a Network Rail station in the UK. The pedestrian bridge was erected in one weekend without the use of a crane and uses Layher Allround and the new Layher Allround Bridging System.

Layher Protect was fixed to the inside of the bridge to prevent objects from being dropped onto the railway tracks below. This successful temporary access solution will be used whilst the permanent bridge, a very old Victorian bridge is dismantled, repaired and cleaned, then re-built.

Thank you to Sean Pike of Layher UK for the use of these photos.

Bookmark and Share

Download PDF


pdficon Network Rail
Pedestrian Bridge
(1.4 MB)



Links to Layher products


Stairs and temporary access solutions from Layher Scaffolding

Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative



Recent Scaffold Projects


Mobile Scaffold Gantry in Tunnel
Goeltzsch Valley Bridge
Pre-cast Scaffold Cantilever
Exclusively Layher

Extra Weeks Hire
Rent Scaffolding Set
Boarding Final Call
Industrial Bridging Truss System

Public Access Stairs
Scaffold with a view
Scaffolding Rob Roy Hotel
Scaffold Suspended Bridge
Eggcellent Access

Scaffolding Seaview Marina
Hospital Temporary Roof
Stockton Mine Scaffold
Mining Truck Stop
Megayacht Temporary Roof

Power Substation Scaffold
Harbour Crossing Falsework
Bondi Bowlarama
Layher Boot Camp
Allround Scaffolding Star

Alumina Refinery Training
Warragambah Dam
Beam Me Up
Bovis Training Day
Cantilevered Facade

Swan Brewery Birdcage
Double Cantilever with Drop
Stadium Propping
Taupo Cycle Bridge
Temporary Pedestrian Bridge



 
RSS feed - Layher ScaffoldingYouTube - Layher ScaffoldingTwitter - Layher ScaffoldingFacebook - Layher ScaffoldingLayher Scaffolding