HomeScaffold Projects 133 Molesworth Street
133-molesworth-street
Geeves Scaffolding were commissioned by Fletcher Construction to erect the scaffolding for the 133 Molesworth Street Project. Approximately 70 tonne of Layher Allround was used for exterior scaffold and interior propping with the exterior being completed over a five week period.

“Only two legs every five metres could be landed as they were building the lower extension from the building while the scaffolding was up. Diagonal bracing was used extensively throughout the base” said Operations Director, Tim Geeves.

The client was very happy with the speed of the construction which took five scaffolders 1100 man hours to complete the build. “The speed that the Lahyer Scaffolding System went up on the exterior allowed the contractors to move along with their work and stay within the contracts tight timeline” he said.

Thanks to Geeves Scaffolding for the use of these photos.

Geeves Scaffolding website: www.geevesscaffolding.co.nz

molesworth-street1
Bookmark and Share

Links to Layher products


Layher scaffolding is faster to erect, saving you time and money.

Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative