HomeScaffold Projects Maari Platform Free Fall Life Boat Install
Maari Platform Free Fall Life Boat Install
This technically challenging scaffold involved providing access to install a free fall life boat (FFLB) to the Maari Platform in the Taranaki Basin. Fitzroy Engineering installed this 8.5m high x 16.5m long Layher ALLROUND scaffold 28 m above sea according to very strict rules regarding working over water.

The build involved craning Layher ALLROUND towers up to 12m high from the top deck and joining them using Layher aluminium beams spanning up to 6m. Transfield Worley Ltd Project Engineer Steve Walton said the structure was installed and commissioned safely and on time.

The access provided by Fitzroy Engineering and Layher was a major contributing factor to the success of this project.

Thank you to Geoff Moore, Scaffolding Supervisor, Fitzroy Engineering for use of these photos.

Fitzroy Engineering website: www.fitzroy.co.nz

Maari Platform Free Fall Life Boat install1
Bookmark and Share

Download PDF


pdficon Maari Platform Free Fall Life Boat Install (0.9 MB)


Links to Layher products


Industrial suspended scaffolding from Layher

Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative









 
RSS feed - Layher ScaffoldingYouTube - Layher ScaffoldingTwitter - Layher ScaffoldingFacebook - Layher ScaffoldingLayher Scaffolding