Civil Works Scaffolding were engaged by Moana Construction to erect a temporary roof on this Puketea Close site in Paraparaumu, Wellington.

“Using the Layher Allround System with the Keder Roof support at the top of the scaffolding and having one lattice beam 2 metres longer than the opposite side made spanning the two different lengths of roof pitches possible. That way both scaffolding structures could be built on solid ground next to the house” said Gary Porter of Civil Works Scaffolding.

12 tonne of gear was used on the project by four scaffolders over a 5 day period with Gary commenting that “The contractor enjoyed having a dry working environment on a daily basis”.

Thanks to Civil Works Scaffolding for the use of this photo.

Civil Works Scaffolding website: www.civilworksscaffolding.co.nz

Bookmark and Share

Links to Layher products


Layher scaffolding is faster to erect, saving you time and money.

Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative