Camelspace were called upon to design and build three sealing-end structures for Auckland’s new 220kV circuits at the point where they return above ground.

The structure was built using Layher’s Allround modular system and aluminium beams 750 and then wrapped.

Phil McConchie commented that “specialist high voltage cable joint contractors, who were brought to New Zealand especially for the project, spent four weeks working on the scaffold and commented it was one of the best they’d seen anywhere in the world”.

These fully clad and roofed structures needed to be designed and built to withstand high winds, consequently each structure had over 50T of ballast, 171T in total.

Thank you to Phil McConchie and Mick Spratling for use of these photos.

Camelspace website: www.camelspace.com

Bookmark and Share

Download PDF


pdficon 220kV Substation Scaffold (2.8 MB)


Links to Layher products


Industrial scaffolding for maintenance from Layher

Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative









 
RSS feed - Layher ScaffoldingYouTube - Layher ScaffoldingTwitter - Layher ScaffoldingFacebook - Layher ScaffoldingLayher Scaffolding