Ugly Building - Beautiful Scaffold

Ugly Building - Beautiful Scaffold

The boys from Alphasafe built this free standing 45m run in 2 days. Mike said "Standing 14m at its highest point the scaffold was used by painters to hide an eyesore of a wall in a new development in Randwick. Below the scaffold are two tin sheds which we had to span, the longest being 13m.

For this we cantilevered 3m each side of the shed and spanned the rest initially with ali beams to build without touching the roof. Once the scaffold above the shed was built to the first deck height, a series of bracing was used to give maximum strength over the 13m span.

The job took four men two days to complete and only one day to dismantle."

Thanks to Alphasafe Scaffolding for the use of this photo.



Download PDF


pdficon Ugly Building - Beautiful
Scaffold (0.7 MB)



Links to Layher products


Scaffolding components


Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative


















 
RSS feed - Layher ScaffoldingYouTube - Layher ScaffoldingTwitter - Layher ScaffoldingFacebook - Layher ScaffoldingLayher Scaffolding