Standing at a little over 30 m this scaffold was erected by Fitzroy Engineering for Shell Todd Oil Services. With aluminium stairs running the entire way up the boys were always on time for Smoko J.
Once again there was a lot of intricate work needed to avoid all the obstacles on the way up. The scaffold is being used to reclad and paint the tower and up to 6 levels will be clad with Keder Rails & Sheets to protect the workers from the harsh environment.
Our thanks to Craig Graham for this photo.