Best First Featured Job 2008
WINNER New Zealand

Over The Clarence

This road bridge over the Clarence River in the upper South Island of New Zealand is undergoing a seismic retrofit by Fulton Hogan which involves installing 200kg steel plates under the mid sections of each span.

Lyndon Robinson of Scaffold Marlborough was set for a challenge. Having been told it was a 2 - 3 day tube-and-fitting job he knew he had the right system for his men to do it in under one! In the event it took less than five hours from the arrival of the truck to sign off.

The scaffold was built on the riverbed on a screw jack and base collar platform and then winched into position. It was designed by our in-house design team. The tying-in and overall project was signed off by a local engineer.

Thank you to Lyndon Robinson of Scaffold Marlborough for the use of this photo.
Scaffold Marlborough website: www.scaffoldmarlborough.co.nz



Download PDF


pdficon Over The Clarence
(0.3 MB)



Links to Layher products


Allround scaffolding


Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative


















 