HomeProjects Liverpool Sewerage Treatment Plant Access Stairs
Liverpool Sewerage Treatment Plant Access Stairs

Liverpool Sewerage Treatment Plant Access Stairs

This elaborate access built by Pipeline Rigging into three adjoining sewerage tanks at Sydney Water's new Liverpool STP not only allowed the contractors easy access into the tanks but also changed Sydney Water's working environment from a confined space to a regular job site. This negated the need for constant Confined Space supervision and allowed the job to flow faster and more smoothly. The job comprised three 1.57m wide stairs, built on Allround stringers, dropping 4m into the tanks with 5.14m bridges suspended over the wall of each with diagonal bracing.

Thanks to Clinton Mauger from Pipeline Rigging for this photo.



Download PDF


-


Links to Layher products


Scaffolding decks (planks)


Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative


















 
RSS feed - Layher ScaffoldingYouTube - Layher ScaffoldingTwitter - Layher ScaffoldingFacebook - Layher ScaffoldingLayher Scaffolding